Welcome to WordPress. This is your first post. Edit or delete it, then start writing!

Welcome to WordPress. This is your first post. Edit or delete it, then start writing!
1 Comments On “Hello world!”
Lorem ipsum dolor sit amet elit sed do adipiscing eiusmod donec pede.
Where structural engineering approval is required, we work alongside qualified third-party engineers.
Ensures suspension planning is technically viable, compliant with venue requirements, and aligned with approved load schedules.
Final engineering calculations and formal sign-off remain the responsibility of qualified structural engineers where required.
Consultancy services are delivered on a project basis and can be provided independently or alongside other Rigdar services.
Automation systems are operated and programmed by qualified automation technicians.
Automation requirements are reviewed on a project-by-project basis, considering:
All automation systems are installed and operated in accordance with:
Structural engineering and load approvals remain subject to appropriate sign-off where required.
Structures are designed around project requirements and venue constraints.
All installations follow manufacturer specifications and relevant safety standards.
Where project conditions require rope access operations, IRATA-trained rope access riggers can be made available.
Suitable for:
Rope access personnel are deployed subject to project requirements and availability.
On-show crew can be supplied for short-term activations or extended event durations.
Breakdown crews operate within strict venue move-out windows and coordinate closely with production and technical teams to ensure safe and timely removal.
Crew operate in line with:
Personnel are experienced in working within large UK venues and multi-contractor build environments.
All lifting accessories are supplied in accordance with relevant load ratings and operational requirements.
Where required, documentation relating to inspection and certification can be provided.
Transport can be arranged upon request.
Equipment can be supplied as dry hire or combined with installation and crew services depending on project requirements and availability.
Motor installations are carried out in accordance with approved load schedules and venue point allocations.
Structural calculations and engineering approvals remain the responsibility of the appointed engineer unless contracted separately under Consultancy.
All works are carried out in line with LOLER, PUWER, Work at Height Regulations, and venue-specific rigging policies.
We coordinate with venue technical teams, stand builders, lighting departments, and production managers
to ensure installation aligns with the wider build schedule.

Hi, this is a comment.
To get started with moderating, editing, and deleting comments, please visit the Comments screen in the dashboard.
Commenter avatars come from Gravatar.